Български English Русский العربية
 

ORONTO – LATAKIA RAILWAY, SYRIA

Country: Syria Syria
 

84 km long cutting through the Aleutian mountains Excavation work 11,000,000 cu. m, 60 % of which in rock Backfilling 8,500,000 cu. m. Total length of the tunnels 1850 m. The highest of the twenty viaducts is 71 m, the longest one 540 m. 34 bridges and 186 culverts have been constructed and some of them are more than 150 m long. There are also 8 flyovers of pre-cast structure.


      By country
      Infrastructure Projects
• Bridges and Roads in Syria, Iraq;
• Railway in Syria;
• Infrastructure Projects in Libya;
• Optical Cables in Bulgaria